News Flash

Home - Public Works

Posted on: May 13, 2019

Sidewalk Replacement on Divinity Street

PUBLIC NOTICE

SIDEWALK REPLACEMENT

May 8, 2019

 

The
City of Bristol is scheduled to remove and replace the sidewalks located infront of your address on Divinity Street. View the map indicating the sidewalk
replacement areas here. The work is scheduled to start on Monday,May 13, 2019.

The
work will consist of removing the existing sidewalk, installation of new sidewalk,and loaming and seeding the areas disturbed.
Please note the following:

1.    The lawn area locatedapproximately 1.5 feet on each side of the walk will be excavated/disturbed as
part of the project, however, as indicated, the area will be loamed and seeded.

2.    When the work isbeing done in front of your property, there will be no access to driveways for
approximately 3 days.

3.    Mailboxes may betemporary disturbed; however, they will be reset to maintain delivery of
mail.  If mail is not delivered, pleasecontact the City immediately to resolve the issue. 

4.    The lawn areas
disturbed during construction will be loamed and seeded.  Property owners are encouraged to water theareas to promote growth of grass.

5.    Properties with lawn
sprinklers located within the City’s roadway right of way (along the road andwalk) shall notify the City prior to the start of work and shall remove
sprinklers from the project work area (1.5 feet surrounding walk).  Please note that the City is not responsiblefor the damage of sprinklers in the referenced area.


Once
work commences, it will take approximately 3 weeks to complete the majority ofthe work.  

Additional notification will be forthcoming if there are revisions to the proposed project scope or schedule.   On behalf of the City I apologize for any inconvenience this project may cause and would like to thank you in advance for your cooperation.   

Please
contact our office to provide the best contact information to keep you informedof the construction schedule. 

Please
feel free to contact Nancy Levesque, P.E. or Sean Harris in the CityEngineering Department at 860-584-6125 with any concerns or questions. 

nancylevesque@bristolct.gov or seanharris@bristolct.gov

 

Facebook Twitter Email

Other News in Home - Public Works

City Hall Summer Hours Schedule

Posted on: May 29, 2019

Book Collection

Posted on: May 31, 2019

Recycling 101 Workshop

Posted on: May 28, 2019

Recycle Coach App

Posted on: May 21, 2019

Help Keep Bristol Clean & Green

Posted on: May 28, 2019

Yard Waste Barrels Out of Stock

Posted on: April 30, 2019

Spring Paving List

Posted on: April 12, 2019

2019 Yard Waste Season Reminder!

Posted on: March 11, 2019

Additional Rubbish Barrels

Posted on: December 17, 2018

Curbside Barrel Policy Reminder

Posted on: October 23, 2018

2019 Recycle Calendars

Posted on: October 19, 2018

Attention Bristol Landlords

Posted on: October 11, 2018