NOTICE
SHRUB ROAD SIDEWALKS
Dated October 7, 2025
The City of Bristol Department of Public Works continues to proceed with the project to install sidewalks and traffic calming measures on Shrub Road and the portion of Jerome Ave from Shrub Road to Stevens St. The project is funded, but delays by the design engineer AI Consultants Inc. has delayed the review of their plans by CT DOT. As a result, construction will NOT start in 2025 and will be delayed to the spring 2026.
Plans for the project are available on the City’s website by going the “City of Bristol Official Website”, “Departments”, “Department of Public Works”, “Divisions of Public Works”, “Engineering”, “Shrub Road Sidewalks”:
https://www.bristolct.gov/DocumentCenter/View/50116/Final-Specs
https://www.bristolct.gov/DocumentCenter/View/50117/Full-Set
The sidewalk and traffic calming layout remains as previously presented to the public. Concrete sidewalks will be installed only on the north side of shrub road. In order to reduce speeds, travel lanes will be reduced to 10 ft., and painted 4 ft wide islands will be installed in the areas of Environmental Learning Center and in the area of the Shrub Road intersection with Oakhill Drive.
The Department of Public Works apologizes for any inconvenience the project delay may cause.
Residents with questions on the project are encouraged to contact the Department of Public Works at 860-584-6113.